Escondido, CA
Cloudy
Cloudy
64°F
 

Long list of projects completed at Lake Dixon

A future park host site was added this spring at Daley Ranch.

Over the past few months, the city has  completed a lot of work at Lake Dixon. These projects were made possible by the Lake Division in collaboration with many different departments and organizations:

A playground donated by the Hidden Valley Kiwanis Club was installed at Dixon Lake.

The Dixon Lake road from the entrance to the ranger station was repaved.

New roofing was installed by Building Maintenance on the camping cabin and picnic shelters.

The Daley Ranch parking lot got a new ranch style fence to help delineate parking and several hazardous trees were removed at both Lake Dixon and Lake Wohlford.

Security cameras were installed at Lake Dixon by Information Systems.

Almost 11 miles of trail (about 44% of the city’s overall trail system) were made safer and more sustainable at Daley Ranch by Lakes and Public Works staff.

A future park host site was added at Daley Ranch as per the master plan. The pad was graded and electricity, sewer, and water were connected. Work has started to convert campsite 9 into a full-hookup campsite or future host site. 

This playground at Dixon Lake was donated by the Hidden Valley Kiwanis Club.

 

The Dixon Lake road from the entrance to the ranger station was repaved.

Leave a Reply

Your email address will not be published. Required fields are marked *